Home

Overview

Goals and Design Summary

Barn/House Site

Recreational Use

Environmental Research

Neighbors

Other

Feedback or contact us

Team

Overview Team

Architect

Construction Consulting

Timberframe Design

Timberframe Construction

Mechanical Engineering

Electrical Engineering

Solar Electric Consultant

Environmental Consultant

Lighting & Daylighting

Building Envelope

Electricians

Plumbing and HVAC

Finish Carpentry

Design Plans

Overview Design Plans

Exterior Views

Site and Landscape Plans

Architectual Plans

Timber Frame Plans

Timber Frame Stair Plans

Electrical Plans

Mechanical Plans

Meeting Notes

Building Schedule

Building Requisitions

Electrical

Overview Electric

Solar Electric

Lighting

Hydro electric dam

Hydro Electric Turbine

Dam Consultant

Generator

Heating

Overview Heating

Masonry Heater

Radiant Heat

Passive Solar Heat

Plumbing

Overview Plumbing Systems

Composting Toilets

Bathroom Fixtures

Grey Water System

Building Process

Overview Building Process

Were do houses come from?

Saw Mill Operation

Timber Frame Process

Timber Frame Tools

Timber Frame Joints

Site Preparation

Foundation Installation

Timber Frame Raising 1st Floor

Timber Frame Sealing and Finish

Timber Frame Raising

Envelope Framing

Roofing System

Insulation

Radiant Floors

Plaster and Painting

Construction Waste Management

Lessons Learned

Products

Overview Building Products

Wood Used

Lumber Drying & Plaining

Stains and Sealers

Borate Treated Wood for Sills

Durisol Foundation

Windows

Radiant Floor Products

Appliances

Interior

Interior Overview

Bedrooms

Bathrooms

Kitchen

Stairs

Green Certifications

Green Woodlands

Connecting with Nature

Building Requisitions
This section will be used as an electronic storage area for all requisitions for the project. Access to this area is limited.
 
Bruss Construction Invoice dated May 12, 2006
Bruss Construction Requisition number two dated July 17, 2006
Bruss Requisition Number Three 8/7/2006
Bruss Requisition Number Three Modification
Bruss Requisition Number Four 9/12/2006
Bruss Requisition Number Five
Bruss Requisition Number Six
Bruss Requisition Number 6 Revision
Bruss Requisition Number 7 Nov 18, 2006
 
Banwell Invoice July 17, 2006
Insurance Certificates, these may have limited access
Bruss Certificate of Insurance
Newton Excavation Certificate of Insurance
Weeks Insurnace Certificate
CSR Enterprises Certificate of Insurance
 
Change Orders
 
Change Orders Number 3-11, 10-18-2006
Change Order Number 12, Dec 12, 2006
Change Order Number 13, Dec 12, 2006
Change Order Number 14, Dec 12, 2006
Change Order Number 15, Dec 12, 2006
Change Order Number 16, Dec 12, 2006
Change Order Number 17, Dec 12, 2006
Change Order Number 18, Dec 12, 2006
 

Various Contracts


 
Newton Excavation Contract for Site Work (limited access)
Bruss Rider to Construction Mgment Agreement (limited access)
 
Waivers
Mink Hill Waiver